Excavator bucket design pdf




















While arm and bucket cylinder is used for digging force developed through actuators during the excavation. Thus, calculation of digging force must be digging operation.

This paper focuses on the evaluation carried out separately when arm or bucket cylinder is the method of bucket capacity and digging forces required to active cylinder [2]. The maximum digging forces are the dig the terrain for light duty and heavy duty construction digging forces that can be exerted at the outermost cutting work.

This method provides the prediction of digging forces point. These forces are calculated by applying working and can be applied for autonomous operation of excavation circuit pressure to the cylinder s providing the digging task. The evaluated digging forces can be used as boundary force without exceeding holding circuit pressure in any condition and loading conditions to carry out Finite Element other.

As the use of excavator in day to day life is Analysis of the Excavator mechanism for strength and increasing for many purposes but the applicable site is not stress analysis.

An analytical approach provided for static inspected properly due urgency of work by the owner or force analysis of mini hydraulic excavator attachment. The the contractor due to which improper handling of it leads objective of this paper is to design an excavator bucket to to damage of the ground engaging tool i. The get smooth flow of material and to get effective digging bucket of the excavator is main contacting part of it which forces.

So in this case sometimes the Key Words: Excavator, optimization, bucket volume bucket gets damage due to some improper handling by the calculation, stress analysis. Here I calculate the stresses in bucket by analytically and Finite analysis approach and then compares their results.

Here needs to 1. Applications for excavator in India include use as a utility machine at large construction sites roads and dams for 2. An excavation task. The evaluated digging forces can be used excavator is an engineering vehicle consisting of a bucket as boundary condition and loading conditions to carry out with cabin for the operator and tracked system for Finite Element Analysis of the backhoe mechanism for movement and engine is used for power generation.

An generalized breakout Hydraulic system is used for operation of the machine force and digging force model also developed using the while digging or moving the material. Excavation is of fundamentals of kinematics of backhoe. Manisha P. Model is exported through IGES file format for meshing in analysis software Boundary conditions and the forces are applied at the tip of teeth of excavator bucket.

In this paper the stresses developed at the tip of excavator bucket teeth are calculated. Catalogs JCB India ltd 3 Analysis methods ,loading conditions, attachment dimensions ,material standards, cylinder pressure, boom arm and link dimensions and all other standard. Thus, it is very much necessary for the designers to provide not only a equipment of maximum reliability but also of minimum weight and cost, keeping design safe under all loading conditions [2].

Although excavation is ubiquitous in the construction industry, most day-to-day operations proceed on technology that is decades old— technology that has not kept pace with other industries. A recent trend towards greater automation of excavation machines reflects a larger movement in the construction industry to improve efficiency. Currently, human operators require ten to fifteen years of experience before they can be Chart -1 Flow chart considered experts.

Their work is often dirty, strenuous and repetitive [5]. Autonomous excavation has attracted 5. This research concerns the which is to be analysed for the bucket capacity, volume, problem of automating a hydraulic excavator for mass forces and then optimize it.

This application is commonly found in many constructions and mining scenarios. In such applications, fast operational speed of these machines is desired, because it directly translates to increased productivity. Bucket capacity calculations- volume shall be decreased by the volume of the mechanism Vm Bucket capacity is a measure of the maximum volume of the material that can be accommodated inside the bucket of the backhoe excavator.

Bucket capacity can be either measured in struck capacity or heaped capacity. The struck capacity directly or in liters and published as a rated capacity in Accordance measured from the 3D model of the backhoe bucket with this International Standard. As can be seen from the left side of the Fig.

This provides a reduction of the struck volume so as to take the indentation into account. Top volume, Vt- The Y indentation shall not be taken into consideration for the calculation. The W4 dimension shall be included for the calculation. The top volume is calculated as follows see Figure Wall cut depth- 5. Digging forces Where, dF is the sum of bucket tip radius dD and the arm link length in mm, and DA is the end diameter of the arm Bucket penetration into a material is achieved by the cylinder in mm.

These forces can be calculated by applying working relief hydraulic pressure to the cylinders 5. Comparison of excavator models providing the digging force. Table shows the compares on of physical dimensions, bucket specifications and forces of the designed excavator with the standard excavators. According to SAE J Maximum radial tooth force due to bucket cylinder bucket curling force FB is the digging force generated by the bucket cylinder and tangent to the arc of radius dD Table Comparison of bucket parameters Where DB is the end diameter of the bucket cylinder 6.

Excavator is a construction machine which is widely used for various constructions, mining and agricultural work. View 1 excerpt, cites methods. The Hydraulic excavator machines are heavy duty earth movers consisting of a boom, arm and bucket. It works on principle of hydraulic fluid with hydraulic cylinder and hydraulic motors. The Hydraulic … Expand. View 1 excerpt, cites background.

Excavators are often used in the mining and construction projects. They are the digger machines normally used for dredging materials in mine, digging, leveling the ground, dredging the river, etc. Excavator bucket performs heavy duty work as a earth movers. Several high pressurehigh impact loads come on the teeth of the bucket.

Sudden impact on earth surface, high stresses and shearing loads … Expand. Draglines are heavy and costly machines massively utilised in opencast mines to remove the overburden materials.

Because of harsh operating situations advanced wear, tear, fractures and fatigue … Expand. Finite element analysis applied to the taper mechanism of excavator assembly alignment analysis and optimization.

Abstract This study aimed to solve the problem of interference misalignment when assembling the attachments of an excavator. A mechanical structure for taper guiding mechanism model was designed to … Expand. Experimental and numerical analysis of rotary tricone drill bit and its wear prediction.

Static and fatigue analysis was carried out, and … Expand. An excavator is a typical hydraulic heavy-duty human-operated machine used in general versatile construction operations, such as digging, ground leveling, carrying loads, dumping loads and straight … Expand. Due to the complexity of the structure of working device of backhoe single bucket hydraulic excavator and variability of boundary condition,it is very difficult to analyze its static … Expand.

Finite element analysis of hydraulic excavators based on Workbench. Static analysis of the hydraulic excavator in the maximum excavating depth and lowest boom position is conducted by the finite element method of workbench. Through calculating load,meshing,confirming … Expand. Improvements for a Hydraulic Excavator's Boom. Focus on stress concentration and high stress area, four improvements were put forward through analyzed a hydraulic excavator's boom with the finite element method under the bucket digging condition.

Fatigue reliability of the excavator's boom. To evaluate the fatigue reliability of the excavator's boom structure,took one 6t excavator's boom for research object,simplified the structure reasonably ,constructed the calculation model of … Expand.



0コメント

  • 1000 / 1000